Recent
Projects
Home Entrance Renovation
The Specification : Our client wanted to upgrade the kerb appeal of their property with a more modern feel.
The End Result
Our team relocated the existing door opening to the centre of the porch, added a modern Ultimate external door and frame with an additional wood side panel, supplied and fitted a new Hormann up and over garage door. Applied K-Rend to the exterior and upgraded the existing guttering.
Bespoke Bell Tower
The Specification: Our client wanted to replace a temporary housing for their Peace Bell which rings out on special occasions.
The End Result
We constructed a new tower by building a concrete slab base, installing a bespoke tower of solid oak and a tiled roof. The bell was installed along with a marble commemorative stone supplied by the client.
Mencap Donation Centre
The Specification: Our customers contacted ABD Builders Ltd, wanted a commercial unit converted into a donation centre with retail space, bag bays, sorting area, office, kitchen and toilet facilities
The End Result
We supplied a full electrical installation, constructed an office, kitchen and toilet areas, full decoration including commercial grade carpet and vinyl plank flooring throughout. Manufactured and installed bag bays and counter tops to the sorting area and a spacious retail area to the front of the unit.
Shop Renovation
The Specification: This new client wanted us to completely renovate their new store.
The End Result
Utlising the most of the space available we completely transformed this shop to ensure they had the display and storage capacity they needed. From glazing to flooring we completely transformed this new shop to ensure there was ample space for consumers to move around and shop.
Room Dividers
The Specification: Our client wanted some privacy for 6th form students within the canteen.
The End Result
We manufactured and installed Oak vaneered MDF louvered room dividers to section off the area.
External Aluminium Doors and Frames
The Specification: Our client required a secure entrance to the building
The End Result
We replaced existing timber doors with aluminium powder coated door and frame. We also upgraded the CCTV and added an electronic door entry system.
Get Started On Your Next Service
Get Your Free Quote
Contact
Call Us
0151 495 1503
office@abdbuilders.com
We Cover
The North West